MAINTENANCE & SUPERVISION

With LNG becoming increasingly viable and popular as a marine  fuel,

E&CO continues to develop technical solutions that facilitate this trend

                          E&CO MAINTENANCE & SUPERVISION

 

E&CO can provide best manpower for customers’ request for site trouble shooting.

Planned maintenance and customer-focused supervision service is our pride for project success.

Timely manner of maintenance & supervision can make to prolong equipment operation time and maintenance period.

E&CO keeps strict HSE policy in terms of highly technical service and responsibility.

E&CO, we believe good service recreate customers’ value & profits.

A/S WORKS

A/S WORKS

- FGSS System (Storage part, Fuel gas supply part, Propulsion part)

- ISO Tank Container, Tank Lorry,  Tank Trailer

- Cryogenic Tank & Pressure Vessel

- Site Construction, Erection, Piping, Fabrication, Electric, Extra Equipment etc.

VACUUMING WORKS

VACUUMING WORKS

- Tank Vacuuming Works in Site

 - Tank Vacuuming Works in Site

   : Vacuuming work time shall depend on the tank status & environment condition 

  * Normal Vacuum ( Max. Vacuum 0.05 Torr ) : Centrifugal Pump

  * High Vacuum ( Max. Vacuum 0.001 Torr ) : Diaphram Diffusion Pump

<Normal Vacuum Pump>

<High Vacuum Pump>

WELDING WORKS

WELDING WORKS

 - Plate & Piping

  * Shielded Metal Arc Welding (SMAW)

  * Gas Metal Arc Welding (GMAW)

  * Gas Tungsten Arc Welding (GTAW)

  * Flux Cored Arc Welding (FCAW)

  * Submerged Arc Welding (SAW)

  * Electro Gas Welding (EGW)

  * Plasma Arc Welding (PAW)

  * Stud Welding (SW)

PAINTING WORKS

PAINTING WORKS

 - Shop and site work available

 - Sanding and Short work

 - 1ST, 2ND Epoxy Primer, Epoxy Paint work

 - 3RD Urethane Paint work

 - Fire Resisting Paint work available

 - Painting work takes about 5 days (<30㎥) ~ 10 days (>30㎥)

PIPING & TUBING WORKS

PIPING & TUBING WORKS​

 - Stainless Steel, Duplex & Carbon Piping work available

 - Available Size Range 6A (1/8") ~ 500A (20")

 - Tube, Union, Elbo, Clamp Extra Equipment etc. work available

 - Shop Fabrication work㎥)

INSULATION WORKS

INSULATION WORKS (perlite or MLI)

 - Perlite works in both shop and site

 - MLI work only in shop

 - Perlite work takes about 7 days (<30㎥) ~ 14 days (>30㎥)

 - MLI work takes about 14 days (20ft ~ 40ft)

<Perlite Insulation work>
<MLI Insulation work>
VALVES REPAIR WORKS

VALVES REPAIR WORKS

 - Globe, Check, Gate, On-off, Control, Ball valves, and etc. repair work available

 - Re-inspect safety valve (Popping test)

 - Product and parts replaceable

SITE SUPERVISION

SITE SUPERVISION

 - Shop and site work available

 - Sanding and Short work

 - 1ST, 2ND Epoxy Primer, Epoxy Paint work

 - 3RD Urethane Paint work

 - Fire Resisting Paint work available

 - Painting work takes about 5 days (<30㎥) ~ 10 days (>30㎥)